Agriculture and Agri-Food Canada Service Standards – Quarterly Results: Fiscal Year 2024-2025

These results highlight how Agriculture and Agri-Food Canada's programs and services have performed in recent quarters at meeting our service standard commitment of 80% under normal circumstances.

Quarterly results

  • Access to Information and Privacy (ATIP)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Response is provided within 30 days following receipt of request.

    90

    93

    98

    97

  • Advance Payment Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    67

    100

    100

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    88

    93

    Send an agreement to the approved applicants for review and signature within 8 weeks following receipt of a duly completed application

    80

    60

    100

    43

  • African Swine Fever Industry Preparedness Program: Prevention and Preparedness Stream

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    100

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    100

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    100

  • African Swine Fever Industry Preparedness Program: Welfare Slaughter and Disposal Stream

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    100

    No data available

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    100

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    100

  • AgriAssurance Program: National Industry Association Component

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    100

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    80

    50

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    96

    100

    86

  • AgriAssurance Program: Small and Medium-sized Enterprise

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    100

    Send you an approval or a rejection notification letter within 75 business days of receiving a fully complete applicant package

    80

    83

    100

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    89

  • AgriCommunication

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    No data available

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    No data available

    No data available

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    No data available

  • AgriCompetitiveness

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    100

    No data available

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    100

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    93

    88

    93

  • Agricultural Clean Technology Program: Adoption Stream

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    No data available

    Send an approval or a rejection notification letter within 100 business days of receiving a complete application package

    80

    86

    30

    83

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    83

    72

    94

  • Agricultural Clean Technology Program: Research and Innovation Stream

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    91

    Send an approval or a rejection notification letter within 100 business days of receiving a complete application package

    80

    100

    88

    57

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    59

    65

    68

  • Agricultural Methane Reduction Challenge

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    No data available

    Send an approval or a rejection notification letter within 100 business days of receiving a fully complete application package

    80

    No data available

    No data available

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    No data available

    No data available

    No data available

  • Agricultural Climate Solutions Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    55

    Send an approval or a rejection notification letter within 70 business days of the close of the application process

    80

    No data available

    No data available

    100

    Send payments within 30 business days of receipt of a duly completed and documented claim; this is applicable only if an agreement is signed

    80

    64

    No data available

    40

  • AgriDiversity Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    No data available

    50

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    91

    100

    86

  • AgriInnovate Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    92

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    No data available

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    0

    71

  • AgriInvest

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Percentage of applications processed to issuance of the deposit notice in 45 days or less

    90

    99

    99

    98

  • AgriMarketing Program: National Industry Association Component

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    78

    100

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    100

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    89

    86

    81

  • AgriScience Program: Projects

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    93

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    61

    71

    71

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    26

    26

    38

  • AgriStability

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Percentage of applications processed to the issuance of a Calculation of Program Benefits statement in 75 days or less

    75

    91

    91

    90

  • Canada Brand

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    87

    Acknowledge receipt of your application within 1 business day

    80

    100

    100

    100

    Send you a final approval or rejection notification within ten (10) business days following receipt of a fully documented application

    80

    96

    83

    89

  • Canada Pavilion Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    No data available

    Acknowledge receipt of your application within 1 business day

    80

    100

    100

    No data available

    Send a final approval or rejection notification within 48 hours of receiving the fully documented application

    80

    100

    100

    No data available

  • Canadian Agricultural Loans Act Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    83

    100

    86

    Respond to general inquiries made to our email address before the end of the next business day

    80

    72

    89

    100

    Register loans received from lenders within fifteen (15) business days

    80

    100

    100

    100

  • Canadian Agricultural Strategic Priorities Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    No data available

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    71

    22

    No data available

  • Canadian Soil Information System

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Provide an estimated delivery date for information products within three (3) business days

    80

    100

    100

    100

  • Contact Centre

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Answer calls received within 60 seconds

    90

    94

    97

    95

  • Domestic Statistics and Market Information Web (Horticulture)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Reports: Daily update frequency

    80

    98

    94

    92

    Reports: Weekly update frequency

    80

    96

    94

    90

    Reports: Monthly update frequency

    80

    100

    100

    100

    Reports: Annual update frequency

    80

    100

    100

    100

  • Domestic Statistics and Market Information Web (poultry and eggs)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Reports: Weekly update frequency

    80

    98

    98

    94

    Reports: Monthly update frequency

    80

    100

    96

    83

    Reports: Annual update frequency

    80

    88

    No data available

    No data available

  • Domestic Statistics and Market Information Web (red meat and livestock)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Reports: Weekly update frequency

    80

    94

    94

    87

    Reports: Monthly update frequency

    80

    100

    100

    100

    Reports: Annual update frequency

    80

    89

    100

    100

  • Farm Debt Mediation Service (FDMS)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    100

    100

    100

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    94

    Notify you if your application has been accepted or not by the end of the next business day

    80

    99

    97

    97

    Have all necessary documentation sent to creditors and producers 7 business days prior to the mediation meeting

    80

    83

    85

    92

    Schedule the first meeting within 70 calendar days after acceptance of your application

    80

    81

    80

    81

  • Geospatial Products

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Provide an estimated delivery date for information products within three (3) business days

    80

    100

    100

    100

  • Global Analysis

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    100

    100

    100

    Respond to general inquiries made to our email address before the end of the next business day

    80

    100

    100

    100

    Provide an estimated delivery date for information products within three (3) business days

    80

    100

    100

    100

  • Local Food Infrastructure Fund -7 and 8

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    93

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    No data available

    No data available

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    No data available

    No data available

    No data available

  • Market Access Services

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Single Window requests will receive an acknowledgement on the same or next business day

    80

    97

    100

    99

    Response to Single Window inquiries will follow within five (5) business days

    80

    92

    90

    99

  • Market Development Program for Turkey and Chicken

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    100

    100

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    100

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    No data available

    100

  • National Agro Climate Information Services (Drought Watch)

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries before the end of the next business day

    80

    97

    100

    94

    Provide an estimated delivery date for information products within three (3) business days

    80

    100

    89

    100

  • Office of Intellectual Property and Commercialization

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    100

    Issue a draft Collaborative Research and Development Agreement for review 20 business days following receipt of all required documentation (work plan, budget, Science Director recommendation, completed risk assessment)

    80

    100

    100

    100

    Respond to a client's enquiry regarding posted licensing opportunities within five (5) business days

    80

    No data available

    100

    No data available

    Notify successful proponents 20 business days after the close of the RFP. (reported annually in Q4)

    80

    No data available

    No data available

    100

  • Poultry and Egg On-Farm Investment Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    75

    83

    82

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    43

    28

    45

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    100

  • Price Pooling Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    No data available

    No data available

    No data available

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    No data available

    Send an agreement to the approved applicants for review and signature within 8 weeks following receipt of a duly completed application

    80

    No data available

    100

    0

  • Saint-Hyacinthe Research and Development Centre

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our phone number before the end of the next business day

    80

    100

    100

    100

    Respond to general inquiries made to our email address before the end of the next business day

    80

    93

    100

    94

    Acknowledge receipt of your application within 1 business day

    80

    100

    100

    100

    Send you an approval or a rejection decision notification within 10 business days

    80

    100

    100

    100

  • School Food Infrastructure Fund

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    No data available

    No data available

    75

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    No data available

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    No data available

    No data available

    No data available

  • Supply Management Processing Investment Fund

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    82

    100

    90

    Send you an approval or a rejection notification letter within 100 business days of receiving a fully complete applicant package

    80

    89

    89

    91

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    62

    75

    85

  • Wine Sector Support Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    95

    87

    60

    Send you an identifier within fifteen (15) business days

    80

    97

    100

    No data available

    Send an approval or a rejection notification letter within 100 business days of receiving a complete application package

    80

    No data available

    No data available

    100

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    100

    84

  • Youth Employment and Skills Program

    Service Standard

    Target (%)

    Results April to
    June 2024 Q1 (%)

    Results for July to
    September 2024 Q2 (%)

    Results for October to
    December 2024 Q3 (%)

    Respond to general inquiries made to our email address before the end of the next business day

    80

    92

    88

    93

    Send you an approval or a rejection notification letter within 50 business days of receiving a fully complete applicant package

    80

    100

    No data available

    No data available

    Send you a payment within 30 business days of receipt of a duly completed and documented claim

    80

    100

    99

    99